Data transfer - Subsequent jobs
With this option, every subsequent job will be performed one after the other after the data transfer.
Advanced
Using this option, subsequent jobs can be organized into groups. Jobs from the same group will be performed at the same time after the data transfer. The groups are performed one after the other.
Add job
Opens a dialog where existing jobs can be selected.
Delete job
Removes the job from the list.
Add group
Adds a new group.
Remove group
Deletes the currently selected group.
Process event GUID
A process can be performed once the subsequent jobs have been performed successfully. Simply enter the GUID of the process here.
Start subsequent jobs even if error occurred in the current job
With this setting, all of the entered jobs will be performed even if one of them is cancelled due to an error.